« Back to All Apprenticeships
Civil Engineering Technologists and Technicians
Published
Competency-Based Apprenticeship
Industries
O*Net Code
17-3022.00
Rapids Code
Req. Hours
0
State
DC
Created
Jul 16, 2021
Updated
Jul 16, 2021
Competency-Based Skills
13 skill sets | 14 total skills
Estimate technical or resource requirements for development or production projects
Calculate dimensions, square footage, profile and component specifications, and material quantities using calculator or computer.
Inspect project site and evaluate contractor work to detect design malfunctions and ensure conformance to design specifications and applicable codes.
Inspect facilities or sites to determine if they meet specifications or standards
Evaluate facility to determine suitability for occupancy and square footage availability.
Review technical documents to plan work
Read and review project blueprints and structural specifications to determine dimensions of structure or system and material requirements.
Create graphical representations of civil structures
Draft detailed dimensional drawings and design layouts for projects and to ensure conformance to specifications.
Test characteristics of materials or structures
Conduct materials test and analysis using tools and equipment and applying engineering knowledge.
Estimate operational costs
Develop plans and estimate costs for installation of systems, utilization of facilities, or construction of structures.
Prepare detailed work plans
Develop plans and estimate costs for installation of systems, utilization of facilities, or construction of structures.
Confer with technical personnel to prepare designs or operational plans
Confer with supervisor to determine project details such as plan preparation, acceptance testing, and evaluation of field conditions.
Create maps
Analyze proposed site factors and design maps, graphs, tracings, and diagrams to illustrate findings.
Prepare operational reports
Prepare reports and document project activities and data.
Prepare project budgets
Develop project budgets by estimating the cost of project activities.
Survey land or bodies of water to measure or determine features
Plan and conduct field surveys to locate new sites and analyze details of project sites.
Negotiate prices or other sales terms
Negotiate prices for new contracts or for modifications to existing contracts with contractors.